How Long Does It Take To Build a Swimming Pool?
If there’s one thing necessary in every Phoenix yard, it’s aswimming pool. When the Southwest sun starts blazing and the temperatures climbwell into the triple digits, jumping into the cool water of a swimming poolbrings sweet relief. But whether you want a simple design for swimming laps ora dreamy backyard oasis with a waterfall, grotto, and slides, there’s onequestion about pool installation Arizona homeowners always ask: How longdoes it take to build a swimming pool?
The timeline for constructing a swimming pool can varygreatly depending on several factors. We’ve broken it down so you have aclearer understanding of what to expect.
The Step-by-Step Inground PoolInstallation Timeline
Every project differs, but the typical inground poolinstallation follows a similar timeline.
1. Pool Design Phase
It usually takes two to four weeks to design a swimmingpool. You’ll meet with a pool designer to map out your pool’s size, shape,depth, features, and materials. The more complex the designs andcustomizations, like waterfalls or integrated spas, can add time, but if you’redecisive and have a clear vision of what you want, the process goes muchfaster.
2. The Permitting Process
Permits aren’t anyone’s favorite part of building a swimmingpool, but in many cases, the question of “How long does it take to build aswimming pool?” comes down to getting the necessary permits. The city, county,and your HOA (if you have one) must approve your plans and give you permissionfor excavation, plumbing, and electrical installation. It can take up to sixweeks (or longer) to approve the applications, especially if there’s a backlogof applications or you need to make revisions.
Pro tip? Work with a pool builder who knows the localpermitting rules. A seasoned pro can shave time off the permitting process byavoiding common paperwork pitfalls.
3. Excavation
The pool company can start digging as soon as permits are inhand. The excavation timeline is usually one of the fastest phases of buildinga swimming pool. Some things, like encountering caliche (the hard, cement-likesoil Phoenix is famous for), or working in tight spaces or around undergroundutilities, can slow the excavation, but a few days is usually all it takes.
4. Installation
Most pool building work happens after excavation: Workersmust complete framing, plumbing, steelwork, electrical work, gunite (orshotcrete) installation, and tiling before the water arrives. Builders alsomust leave time in between each stage to allow for curing.
Expect this phase to take four to eight weeks. Add extratime if your pool includes custom features like swim-up bars or automationsystems.
5. Finishing Touches
Once the crew finishes construction, it’s time for the poolfinishing touches, like adding the interior finish, decking, and lighting,filling the pool with water, balancing chemicals, and testing systems.
This final stretch usually takes about a week or two.Extensive landscaping or additional custom features, like custom tiles, mayrequire extra time.
Plan for Construction Delays
Pool contractors can’t provide an exact answer for “How longdoes it take to build a swimming pool?” because there’s always potential forconstruction delays. Most contractors build in extra time to buffer againstissues like:
- Weather delays
- Supply chain problems
- Worksite issues
- Equipment breakdowns
Different swimming pool types also have different installationtimelines. For example, fiberglass pools often take less time than concretepools, which require curing time.
So, How Long Does It Take To Build a Swimming Pool?
It can take up to three or four months to build a swimmingpool from signing a contract until you dive in. When you work with Citiscapes,LLC, to bring your vision to life with must-have pool features like automatic pool covers andtanning ledges, you’ll enjoy a stress-free process, quality workmanship, and agorgeous pool you can’t wait to show off.